
Compliance & Consultancy
MPCB Consent & Legal Compliance
We prepare, file and follow up your MPCB consent applications so your unit can start, expand and keep running without legal interruptions.
Quick answer
Every industry or project in Maharashtra that discharges effluent, emits air pollutants or generates hazardous waste needs MPCB consent: Consent to Establish (CTE) before construction and Consent to Operate (CTO) before production, renewed before expiry. Aaradhya Enviro prepares, files and follows up these applications and tracks consent conditions for units across Maharashtra.
Reviewed by the Aaradhya Enviro compliance team · 18 October 2026
Overview
Every industry, hospital, hotel, large building project or commercial establishment in Maharashtra that discharges effluent, emits air pollutants or generates hazardous waste needs consent from the Maharashtra Pollution Control Board (MPCB). Consent to Establish (CTE) is required before construction or expansion, and Consent to Operate (CTO) is required before production begins. Both must be renewed and kept current.
Consent applications are rejected or delayed most often because of incomplete documents, a wrong category, missing treatment details or a mismatch between declared and actual capacity. Our team handles the complete process: category assessment, documentation, online filing, replies to MPCB queries, site-visit preparation and follow-up until the consent order is issued. We also keep track of your consent conditions and renewal dates.
Who needs this service
- New manufacturing units in MIDC areas (Waluj, Shendra, Chikalthana, Paithan and others)
- Existing units planning expansion, product-mix change or additional capacity
- Hospitals, hotels, housing projects and commercial complexes with STPs or DG sets
- Units whose consent has expired, been refused, or received a show-cause / closure notice
What we cover
Category assessment
Red / Orange / Green / White classification of your activity and the applicable consent route.
Consent to Establish (CTE)
Project report, water balance, pollution load, treatment scheme, site plan and application filing.
Consent to Operate (CTO)
Compliance of CTE conditions, commissioning details, monitoring reports and CTO filing.
Renewal & amendment
Timely renewal, change of name or ownership, capacity or product changes.
Hazardous waste authorisation
Authorisation under the Hazardous and Other Wastes Rules, usually combined with consent.
Notice handling
Replies to MPCB show-cause notices, directions and closure orders, with a corrective action plan.
Our process
-
Step 1
Site & document review
We study your process, raw materials, water use, emissions and existing approvals.
-
Step 2
Category & gap check
We confirm the category and list what is missing before anything is filed.
-
Step 3
Documentation
We prepare the application, drawings, water balance and treatment details.
-
Step 4
Online filing & fees
We file on the MPCB portal and guide you on the applicable consent fee.
-
Step 5
Query reply & inspection
We answer MPCB queries and prepare your team for the site inspection.
-
Step 6
Consent issued & tracked
We explain each consent condition and set reminders for renewal and returns.
What you receive
- Complete consent application set
- Water balance and pollution load statement
- Treatment and monitoring scheme
- Consent condition compliance checklist
- Renewal and return due-date calendar
Applicable regulations
- Water (Prevention and Control of Pollution) Act, 1974
- Air (Prevention and Control of Pollution) Act, 1981
- Environment (Protection) Act, 1986 and Rules
- Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016
Regulations are amended from time to time; we always work to the version currently in force and the conditions in your own consent.
FAQ
MPCB Consent & Legal Compliance: frequently asked questions
What is the difference between CTE and CTO?
How do I know my MPCB category?
How long does MPCB consent take?
Can you help if my consent has expired or a notice has been issued?
Related services
Environmental Clearance (EC)
EC under the EIA Notification 2006: Form 1, ToR, EIA coordination, public hearing and SEIAA / MoEFCC approvals.
Learn moreEnvironmental Audit & Reporting
Environmental Statement (Form V), annual returns, compliance audits and due-diligence reports.
Learn moreETP & STP Design and Installation
Turnkey Effluent and Sewage Treatment Plants: design, supply, installation, commissioning and handover.
Learn moreHazardous Waste Management
Authorisation, storage, manifests, records and annual returns under the Hazardous Waste Rules.
Learn moreFurther reading
Discuss MPCB Consent & Legal Compliance with our team
Share your requirement and get a clear scope, timeline and estimate.
