Wastewater
Effluent Treatment Plant (ETP)
- Designed from your actual effluent analysis
- Physico-chemical and biological stages
- Low operation and maintenance cost
Everything about Aaradhya Enviro in 8 pages: who we are, our 17 services, the systems we build, clients and contact details. Download the PDF or share it on WhatsApp.
A4 · 8 pages · print-ready Request a printed copy

Company Profile 2026
Environmental consultancy & turnkey pollution control
MPCB compliance · ETP / STP · ZLD & RO · Air pollution control · Testing · O&M
One accountable partner for your environmental obligations — approvals, engineering, installation, monitoring and day-to-day operation — for industries across Maharashtra.
Scan to visit
our website
01 · Who we are
Environmental pollution is one of the most pressing challenges facing industry today, threatening the air we breathe, the water we drink and the food we grow. As regulations tighten, industries are expected to operate responsibly while staying profitable.
Aaradhya Enviro was founded in 2018 in Waluj MIDC, Chhatrapati Sambhajinagar, to solve exactly this problem. Backed by a team with 10+ years of hands-on experience, we have served 500+ clients — from small manufacturing units to large industrial groups, sugar factories, construction companies and multinational corporations.
We do not stop at paperwork. We design, install, operate and maintain the physical systems — ETPs, STPs, RO and ZLD plants, air pollution control equipment — that keep a facility compliant every single day.
To make environmental compliance simple, transparent and achievable — protecting the environment while helping clients reduce risk and cost.
To be one of Maharashtra's most trusted names in environmental consultancy and turnkey pollution control.
Environment first
Every solution is designed to protect air, water and soil, not just to pass an inspection.
Client-centric support
Timely, responsive service from the first site visit to years of ongoing O&M.
Engineering quality
Designs based on real data, proven technology and careful execution.
Trust & transparency
Clear scope, honest timelines and documentation you can rely on.
02 · Our approach
Local regulatory expertise
Based in Waluj MIDC with deep, day-to-day experience of MPCB procedures across Maharashtra.
One partner, every stage
Design → approvals → installation → testing → O&M → renewals, under a single accountable team.
Compliance that holds up
Reports and records prepared to match your actual operations, so inspections hold no surprises.
Responsive support
Reach us on phone and WhatsApp at any time for urgent compliance or breakdown issues.
Site visit & assessment
Design & engineering
Regulatory approvals
Fabrication & installation
Testing & commissioning
O&M, monitoring & renewals



03 · Compliance & turnkey projects
MPCB Consent & Legal Compliance
Consent to Establish (CTE), Consent to Operate (CTO), renewals, amendments and statutory filings with MPCB.
Environmental Clearance (EC)
EC under the EIA Notification 2006: Form 1, ToR, EIA coordination, public hearing and SEIAA / MoEFCC approvals.
Environmental Audit & Reporting
Environmental Statement (Form V), annual returns, compliance audits and due-diligence reports.
CGWA NOC & Bio-Medical Waste Authorisation
Groundwater extraction NOC (CGWA) and Bio-Medical Waste authorisation for healthcare facilities.
ETP & STP Design and Installation
Turnkey Effluent and Sewage Treatment Plants: design, supply, installation, commissioning and handover.
ZLD & RO Systems
Zero Liquid Discharge and industrial RO: water recovery with UF, RO, evaporators and dryers.
Air Pollution Control Systems
Wet scrubbers, bag filters, cyclones, stacks and ducting to meet emission limits.
Plant Up-gradation & Retrofit
Performance audits, capacity enhancement and retrofits for under-performing treatment plants.
From consent application to commissioned plant
We prepare MPCB and Environmental Clearance applications and design, build and commission the treatment systems those approvals require — so documents and plant performance always match.



04 · Testing, monitoring & management
Air, Water & Soil Testing
Stack, ambient air, effluent, drinking water and soil testing with compliance interpretation.
Noise Level Monitoring
Ambient, boundary, workplace and DG-set noise monitoring with control recommendations.
Online Monitoring Systems (OCEMS)
Online continuous emission and effluent monitoring connected to CPCB / MPCB servers.
Treatability Studies
Lab and pilot trials that prove the right treatment process before you invest.
Hazardous Waste Management
Authorisation, storage, manifests, records and annual returns under the Hazardous Waste Rules.
Plastic EPR Compliance
CPCB EPR registration, targets, certificates and annual returns for plastic packaging.
Operation & Maintenance (O&M)
Trained operators, daily logs, testing and preventive maintenance for ETP, STP, RO and ZLD plants.
Compliance Training
Practical training for managers, EHS teams and plant operators on compliance and plant operation.
Nucleonic Gauge & Radioactive Source Compliance
AERB documentation and coordination for safe, authorised disposal of disused nucleonic sources.
| Filing | Who files | Due |
|---|---|---|
| Environmental Statement (Form V) | All units holding MPCB consent | 30 September |
| Hazardous waste annual return | Hazardous waste generators | 30 June |
| Bio-medical waste annual report | Hospitals, clinics, labs | 30 June |
| Plastic EPR annual return | Producers, importers, brand owners | 30 June |
| EC six-monthly compliance report | Projects with Environmental Clearance | 1 June & 1 December |
| Consent / NOC renewal | MPCB consent, CGWA NOC holders | Well before expiry |
As per current rules; always check the conditions in your own consent or authorisation. We track these dates for our clients.



05 · Turnkey equipment
Wastewater
Wastewater
Water Recovery
Water Recovery
Water Treatment
Air
06 · Clients & feedback















“Aaradhya Enviro handled our MPCB Consent to Establish and Consent to Operate documentation flawlessly. The team is highly knowledgeable and made the entire compliance process stress-free for us.”
“We had our ETP installed by Aaradhya Enviro and the system has been running perfectly for 3 years. Their O&M team is responsive and ensures we always remain MPCB compliant.”
“Getting Environmental Clearance for our expansion project seemed impossible until we partnered with Aaradhya Enviro. They managed everything from EIA to the public hearing. Excellent team!”
“Our ZLD system was installed on time and within budget. The design team understood our specific chemical effluent requirements and delivered a solution that works perfectly for us.”

Book a free site assessment. Share your requirement and receive a clear written scope, timeline and estimate.
WhatsApp us
Visit website
Review us on Google
Head office
10, Wadgaon Kolhati, MIDC Waluj Area, Chhatrapati Sambhajinagar, Maharashtra 431136
Areas we serve
Chhatrapati Sambhajinagar · Waluj MIDC · Shendra MIDC · Chikalthana MIDC · Jalna · Beed · Latur · Dharashiv (Osmanabad) · Nanded · Ahilyanagar (Ahmednagar) · Nashik · Pune · Mumbai · Nagpur
© 2026 Aaradhya Enviro. Information in this profile is indicative; scope and specifications are confirmed in each project proposal.