From screening to the final clearance letter, we manage the Environmental Clearance process for industrial, construction and infrastructure projects.

Quick answer

Projects listed in the EIA Notification, 2006 — large construction projects, specified industries, mining and infrastructure — need prior Environmental Clearance (EC) from SEIAA Maharashtra (Category B) or MoEFCC (Category A). The process covers Form 1, Terms of Reference, EIA study, public hearing where required, appraisal and six-monthly compliance reports after approval.

Reviewed by the Aaradhya Enviro compliance team · 18 October 2026

Overview

Projects listed in the schedule of the EIA Notification, 2006, such as large construction and township projects, specified industries, mining and infrastructure, need prior Environmental Clearance (EC) before work starts. Category A projects are appraised at the central level (MoEFCC), and Category B projects at the state level (SEIAA Maharashtra).

The EC process involves several stages: screening, scoping and Terms of Reference, baseline studies, the EIA report, public consultation where applicable, and appraisal by the expert committee. We coordinate every stage, prepare the documents, work with accredited EIA consultants and laboratories where required, and answer committee queries until the clearance is granted. After EC, we prepare the mandatory six-monthly compliance reports.

Who needs this service

  • Building and construction projects above the built-up area threshold in the EIA Notification
  • New or expanding industries listed in the EIA schedule
  • Industrial estates, townships and area development projects
  • Projects that need an EC amendment, extension or transfer

What we cover

Applicability check

Whether EC is needed, and whether the project is Category A, B1 or B2.

Form 1 / Form 1A & PFR

Application forms, pre-feasibility report and conceptual plan.

Terms of Reference

ToR presentation and compliance of ToR points in the EIA study.

EIA & EMP coordination

Baseline monitoring, impact assessment and Environmental Management Plan.

Public hearing support

Coordination with MPCB and documentation for public consultation.

Post-EC compliance

Six-monthly compliance reports and EC amendments when the project changes.

Our process

  1. Step 1

    Screening

    We check applicability and category against the EIA Notification schedule.

  2. Step 2

    Application

    We prepare Form 1 and supporting reports and file on the PARIVESH portal.

  3. Step 3

    Scoping / ToR

    We present the project to the committee and obtain the Terms of Reference.

  4. Step 4

    Studies & report

    Baseline data, EIA / EMP report and, where needed, public hearing.

  5. Step 5

    Appraisal

    We present before SEAC / EAC and reply to all observations.

  6. Step 6

    Clearance & compliance

    EC letter issued; we set up the compliance and reporting schedule.

What you receive

  • Applicability and category note
  • Form 1 / 1A, PFR and conceptual plan
  • Coordinated EIA / EMP report
  • Committee presentations and query replies
  • Six-monthly EC compliance reports

Applicable regulations

  • Environment (Protection) Act, 1986
  • EIA Notification, 2006 and amendments
  • Applicable CRZ, forest and wildlife clearances (where relevant)

Regulations are amended from time to time; we always work to the version currently in force and the conditions in your own consent.

FAQ

Environmental Clearance (EC): frequently asked questions

Does my building project need Environmental Clearance?
Building and construction projects above the built-up area limit specified in the EIA Notification need EC from SEIAA before construction. We check your area statement and confirm whether EC applies.
How long does Environmental Clearance take?
Category B projects appraised by SEIAA Maharashtra commonly take a few months, and Category A projects take longer because of central appraisal and public hearing. Complete documentation from day one is the biggest factor in avoiding delays.
What happens after EC is granted?
The EC letter has specific and general conditions. Project proponents must comply with them and submit six-monthly compliance reports. We prepare and file these reports for you.

Discuss Environmental Clearance (EC) with our team

Share your requirement and get a clear scope, timeline and estimate.

Call WhatsApp

Free consultation

Request a call back

Share your details and our environmental expert will call you, usually within one working day.

We use your details only to respond to your enquiry. Privacy policy