Aaradhya Enviro – Environmental Consultancy & Services
Aerial view of a large sewage treatment plant with aeration tanks and clarifiers

Waluj MIDC, Chhatrapati Sambhajinagar

Environmental compliance & pollution control, handled end-to-end

MPCB consents, Environmental Clearance, ETP/STP, ZLD, air pollution control, testing and O&M — one accountable team trusted by 500+ clients across Maharashtra since 2018.

  • MPCB CTE / CTO & renewals
  • Turnkey ETP, STP & ZLD plants
  • Stack, air & water testing
  • Form V, annual returns & audits
Clients served
500+
Years of team experience
10+
Founded
2018
Specialised services
17

Turnkey projects

Treatment systems designed, built and commissioned

Every plant is designed from your actual wastewater or emission data and handed over with trained operators.

See all systems
Environmental engineers inspecting a treated water sample at a treatment plant

500+ clients

served since 2018, backed by 10+ years of team experience

Why Aaradhya Enviro

One accountable partner instead of five vendors

Consultants who only file papers, contractors who only build, labs that only test — the gaps between them are where compliance fails. We cover all of it.

  • Local regulatory expertise

    Based in Waluj MIDC with deep, day-to-day experience of MPCB procedures across Maharashtra.

  • One partner, every stage

    Design → approvals → installation → testing → O&M → renewals, under a single accountable team.

  • Compliance that holds up

    Reports and records prepared to match your actual operations, so inspections hold no surprises.

  • Responsive support

    Reach us on phone and WhatsApp at any time for urgent compliance or breakdown issues.

How we work

From site visit to steady compliance

  1. 1

    Site visit & assessment

    We study your process, effluent, emissions and existing approvals.

  2. 2

    Design & engineering

    Treatment and control systems sized for your actual load.

  3. 3

    Approvals

    MPCB consents, EC and other permissions filed and followed up.

  4. 4

    Installation

    Fabrication and erection with minimum disruption to production.

  5. 5

    Testing & commissioning

    Performance proved against your consent limits.

  6. 6

    O&M and renewals

    Day-to-day operation, monitoring, returns and renewals.

Our clients

Trusted by industry leaders

A few of the manufacturers, builders and institutions we have worked with.

  • Keller logo
  • Atul logo
  • Rohan Builders (India) Pvt. Ltd. logo
  • Vijay M. Mistry Construction Pvt. Ltd. logo
  • S J Contracts Pvt. Ltd. logo
  • Bai-Kakaji Group logo
  • Vikasratna Vilasrao Deshmukh Manjara Shetkari Sahakari Sakhar Karkhana logo
  • Rena Sugar, Renapur logo
  • Jagruti logo
  • Kohinoor Feeds & Fats Ltd logo
  • Shree Samarth logo
  • Shrinivasa Agro Foods Pvt. Ltd. logo

See all 15 clients

Client feedback

What our clients say

Feedback from plant heads, EHS managers and project owners we work with.

“Aaradhya Enviro handled our MPCB Consent to Establish and Consent to Operate documentation flawlessly. The team is highly knowledgeable and made the entire compliance process stress-free for us.”

Rajesh Kumar

Plant Manager, Jalna Industrial Unit

“We had our ETP installed by Aaradhya Enviro and the system has been running perfectly for 3 years. Their O&M team is responsive and ensures we always remain MPCB compliant.”

Suresh Mane

Director, Beed Manufacturing Co.

“Getting Environmental Clearance for our expansion project seemed impossible until we partnered with Aaradhya Enviro. They managed everything from EIA to the public hearing. Excellent team!”

Priya Deshmukh

CEO, Aurangabad Infrastructure

“Our ZLD system was installed on time and within budget. The design team understood our specific chemical effluent requirements and delivered a solution that works perfectly for us.”

Anil Joshi

Works Manager, Nashik Chemical Plant

“We trust Aaradhya Enviro for our annual environmental audit and MPCB Form IV/V submissions. Their thoroughness gives us full confidence during regulatory inspections.”

Vikram Kulkarni

EHS Head, Pune Auto Components

“Aaradhya Enviro guided us through our entire MPCB consent process and installed a fully functional ETP. Their technical knowledge and post-installation support is exceptional.”

Senior Manager

Rena Sugar, Renapur

Review us on Google

Service area

Based in Waluj MIDC, working across Maharashtra

Our team visits client sites for assessments, installations, sampling and audits throughout Marathwada and the rest of the state.

  • Chhatrapati Sambhajinagar
  • Waluj MIDC
  • Shendra MIDC
  • Chikalthana MIDC
  • Jalna
  • Beed
  • Latur
  • Dharashiv (Osmanabad)
  • Nanded
  • Ahilyanagar (Ahmednagar)
  • Nashik
  • Pune
  • Mumbai
  • Nagpur

FAQ

Common questions about environmental compliance

Quick answers on MPCB consents, treatment plants and clearances in Maharashtra.

What are Consent to Establish (CTE) and Consent to Operate (CTO) from MPCB?
CTE is the permission required from the Maharashtra Pollution Control Board before setting up or expanding an industry or project that may cause pollution. CTO is required after construction, before operations start. Both are issued under the Water Act, 1974 and the Air Act, 1981. Operating without valid consent can lead to closure directions and penalties. Aaradhya Enviro handles the full application process, from documentation to MPCB follow-up.
What is the difference between an ETP and an STP?
An Effluent Treatment Plant (ETP) treats industrial wastewater containing chemicals, oil, heavy metals or other pollutants. A Sewage Treatment Plant (STP) treats domestic wastewater from toilets, kitchens and washrooms. Factories usually need an ETP; housing societies, hospitals, hotels and commercial buildings need an STP; many industrial sites need both.
How long does Environmental Clearance (EC) take in Maharashtra?
Category B projects appraised by SEIAA Maharashtra commonly take a few months, covering documentation, studies and committee appraisal. Category A projects appraised by MoEFCC usually take longer, especially where a public hearing is required. Correct, complete documentation from the start is the biggest factor in avoiding delays.
What is ZLD (Zero Liquid Discharge) and is it mandatory?
ZLD means all wastewater is treated and recovered for reuse, with no liquid effluent discharged outside the premises. It is required for certain highly polluting sectors and is often written as a condition in consents and Environmental Clearances. Even where it is not mandatory, ZLD can significantly cut fresh water costs.
How much does an ETP or STP cost?
Cost depends on the flow (KLD), pollutant load, required treated-water quality, technology and civil scope. As a rough guide, small plants of 10–50 KLD often start in the range of ₹5–15 lakh, while large industrial plants can cost much more. We provide a site assessment and a detailed estimate before you commit. Call +91 99759 29212 for a quote.
Do you work outside Chhatrapati Sambhajinagar?
Yes. We are based in Waluj MIDC, Chhatrapati Sambhajinagar, and work with clients across Maharashtra, including Jalna, Beed, Latur, Nanded, Ahilyanagar, Nashik, Pune, Mumbai and Nagpur. Projects outside Maharashtra are taken up on request.

Need help with environmental compliance?

Talk to our team for a free site assessment and a clear, written plan for your approvals, treatment systems and reporting.

Call WhatsApp

Free consultation

Request a call back

Share your details and our environmental expert will call you, usually within one working day.

We use your details only to respond to your enquiry. Privacy policy